Project

General

Profile

Actions

Evolution #219

open

Simplify voltage sense connector

Added by François Cerbelle over 4 years ago. Updated over 4 years ago.

Status:
Résolu
Priority:
Normal
Assignee:
-
Target version:
Start date:
07/03/2020
Due date:
% Done:

100%

Estimated time:
0:15 h
Spent time:

Description

connect S+/S6 to the front panel switch only, then the switch to the load and sense terminals

Actions #1

Updated by François Cerbelle over 4 years ago

  • Target version set to 1.1
Actions #2

Updated by François Cerbelle over 4 years ago

  • Tracker changed from Anomalie to Evolution
Actions #3

Updated by François Cerbelle over 4 years ago

  • Target version deleted (1.1)
Actions #4

Updated by François Cerbelle over 4 years ago

  • Estimated time set to 0:15 h
Actions #5

Updated by Anonymous over 4 years ago

  • Status changed from Nouveau to Résolu
  • % Done changed from 0 to 100

Applied in changeset fc005-electronicload|commit:341a59f55f81.

Actions #6

Updated by François Cerbelle over 4 years ago

  • Target version set to 1.1
Actions

Also available in: Atom PDF